Allagash Mountain
November 2007 Repair Trip - Photos

October 2007 Survey Trip

The northwest anchor and cable looking in bad condition

(Large Size 1700 x 1200)

A rope is all that holds the northeast guy cable

(Large Size 1700 x 1200)

 

The original northeast guy cable anchor has completely rusted away

(Large Size 1700 x 1200)

 

 

The leftover radio antennas from a former repeater site moved elsewhere. These will later be removed.

(Large Size 1700 x 1200)

 

 

The remains of the antenna cables. These will later be removed.

(Large Size 1700 x 1200)

 

The remains of the southeast guy cable hanging in the breeze, holding nothing

(Large Size 1700 x 1200)

The old radio hut. It had blown over the edge. An attempt to winch it up from this location failed, so it remains here for now.

(Large Size 1700 x 1200)

The northeast footing has deteriorated to the point of needing repair.

(Large Size 1700 x 1200)

The southwest guy cable anchor is rotten and weak.

(Large Size 1700 x 1200)

November 2007 Repair Trip

Mike carrying a bundle of wood up to the summit.

(Large Size 1700 x 1200)

The weekend work crew (minus Roger behind the camera)

(Large Size 1700 x 1200)

Weekend crew closeup -

Left to Right

Josh
Jason, Randy, Brandon, Dan, Mike
Casey

(Large Size 1700 x 1200)

The crew hard at work.

(Large Size 1700 x 1200)

The southeast guy cable, anchor, and hardware - replaced. Good as new.

(Large Size 1700 x 1200)

 

New roof with drip edge board and old antennas and mounts removed.

(Large Size 1700 x 1200)

 

 

 

The northeast guy cable, anchor, and hardware - replaced. Good as new.

(Large Size 1700 x 1200)

 

 

 

Some of the workcrew just finishing up. All that's left is to haul down the generator to the bottom of the mountain!

Left to Right

Rog Morneault, Mike Sirois
Dan Daley, Jason Gagnon

(Large Size 1700 x 1200)

 

This year's repairs finished. Looking Good!

(Large Size 1700 x 1200)

 

Summary - Over the weekend of November 9th, 10th, and 11th, a team lead by Roger Morneault packed equipment, tools, and a generator up to the summit of Allagash Mountain in an effort to do some repairs to the Allagash Mountain Fire Tower. The tower was in questionable shape and needed some shoring up to ensure it would survive the winter. Roger and company replaced all guy lines, hardware, and anchors, replaced the roof, removed the old antennas on the cab, and some other misc. repairs. The tower, which has one loose footing, is now rock solid with the new guy lines and hardware. More work may be planned for this tower next year.
All photos courtesy of Roger Morneault